LOCA_ID |
|
ID |
327-16A |
Location identifier |
HDPH_TOP |
m |
2DP |
1.4 |
Depth to top of section |
HDPH_BASE |
m |
2DP |
3.4 |
Depth to base of section |
HDPH_TYPE |
|
PA |
TP |
Type of depth related information |
HDPH_STAR |
yyyy-mm-ddThh:mm |
DT |
2004-04-01T09:00 |
Date and time of start of section |
HDPH_ENDD |
yyyy-mm-ddThh:mm |
DT |
2004-04-01T11:30 |
Date and time of end of section |
HDPH_CREW |
|
X |
Bill Mallard |
Name of rig/drill crew |
HDPH_EXC |
|
X |
JCB 3CX |
Plant used |
HDPH_SHOR |
|
X |
None |
Shoring/support used |
HDPH_STAB |
|
X |
Stable during excavation |
Stability of trial pit / trial trench or logged traverse length |
HDPH_DIML |
m |
2DP |
27.56 |
Trial pit / trial trench or logged traverse length |
HDPH_DIMW |
m |
2DP |
1.35 |
Trial pit / trial trench or logged traverse width |
HDPH_DBIT |
|
X |
Stepped ABC |
Drill bit used |
HDPH_BCON |
|
X |
Good |
Bit condition |
HDPH_BTYP |
|
X |
Triple tube |
Barrel type |
HDPH_BLEN |
m |
2DP |
3 |
Barrel length |
HDPH_LOG |
|
X |
ANO |
Definitive person responsible for logging the section |
HDPH_LOGD |
yyyy-mm-dd |
DT |
01/04/2008 |
Start date of hole section logging |
HDPH_REM |
|
X |
Breaker required |
Remarks |
HDPH_ENV |
|
X |
Dry, rain, standing water |
Details of weather and environmental conditions during hole section construction |
HDPH_METH |
|
X |
Odex |
Details of method of hole section construction |
HDPH_CONT |
|
X |
ACME Drilling Ltd |
Drilling contractor |
FILE_FSET |
|
X |
FS21 |
Associated file reference (eg drilling journals, hole orientation data) |