| LOCA_ID |  | ID | 327-16A | Location identifier | 
|---|
| HDPH_TOP | m | 2DP | 1.4 | Depth to top of section | 
|---|
| HDPH_BASE | m | 2DP | 3.4 | Depth to base of section | 
|---|
| HDPH_TYPE |  | PA | TP | Type of depth related information | 
|---|
| HDPH_STAR | yyyy-mm-ddThh:mm | DT | 2004-04-01T09:00 | Date and time of start of section | 
|---|
| HDPH_ENDD | yyyy-mm-ddThh:mm | DT | 2004-04-01T11:30 | Date and time of end of section | 
|---|
| HDPH_CREW |  | X | Bill Mallard | Name of rig/drill crew | 
|---|
| HDPH_EXC |  | X | JCB 3CX | Plant used | 
|---|
| HDPH_SHOR |  | X | None | Shoring/support used | 
|---|
| HDPH_STAB |  | X | Stable during excavation | Stability of trial pit /  trial trench or logged traverse length | 
|---|
| HDPH_DIML | m | 2DP | 27.56 | Trial pit / trial trench or logged traverse length | 
|---|
| HDPH_DIMW | m | 2DP | 1.35 | Trial pit / trial trench  or logged traverse width | 
|---|
| HDPH_DBIT |  | X | Stepped ABC | Drill bit used | 
|---|
| HDPH_BCON |  | X | Good | Bit condition | 
|---|
| HDPH_BTYP |  | X | Triple tube | Barrel type | 
|---|
| HDPH_BLEN | m | 2DP | 3 | Barrel length | 
|---|
| HDPH_LOG |  | X | ANO | Definitive person responsible for logging the section | 
|---|
| HDPH_LOGD | yyyy-mm-dd | DT | 01/04/2008 | Start date of hole section logging | 
|---|
| HDPH_REM |  | X | Breaker required | Remarks | 
|---|
| HDPH_ENV |  | X | Dry, rain, standing water | Details of weather and environmental conditions during hole section construction | 
|---|
| HDPH_METH |  | X | Odex | Details of method of hole section construction | 
|---|
| HDPH_CONT |  | X | ACME Drilling Ltd | Drilling contractor | 
|---|
| FILE_FSET |  | X | FS21 | Associated file reference (eg drilling journals, hole orientation data) | 
|---|